New build soundproofing in Calgary

Design Quiet Into the Blueprint with Pre‑construction Planning and Build‑Phase Soundproofing. 


Noise issues are easiest to solve before drywall is installed, when wall, floor, and ceiling assemblies are still flexible. We help you plan the right strategy, reduce flanking pass, and execute cleanly so the finished home feels private, calm, and premium.

Book a build-phase consultationRequest a proposal

Choose your Build TypeJump to the section that matches your project.

Custom Homes

Built for custom homes, infill projects, and duplex builds where noise control needs to be designed in early.

Renovations

For major additions and renovations where walls are open and you can upgrade privacy the right way.

Multiplexes

For townhomes, multiplexes, and multi-unit builds where shared walls and floors demand real speech privacy.

Commercial

For offices, clinics, and businesses that need clear speech privacy, acoustic ambiance and controlled mechanical noise.

BUILT-IN SOUND PROOFING EXPERTISE

Most “soundproofing” problems in new builds aren’t product problems, their assembly + detailing problems.We work with your plans and site reality to recommend practical updates align with your budget, schedule, and lifestyle.

What this typically includes:

  • Identify likely weak points (shared walls, floor/ceiling, paths, mechanical routes).
  • Recommend wall + floor/ceiling assembly options based on your goals.
  • Specify key detail details (sealing, penetrations, flanking paths).
  • Build-phase installation support when required.

Have drawings? Bring them to the call.

Custom homes & Infills

Every custom build has different weak points, stair cores, open-to-below spaces, mechanical zones, room adjacency, noise leaks and flanking paths. We help you design quiet into the structure before drywall, so you’re not “patching” noise problems later.

What we help with:

  • Room-to-room and floor-to-floor noise control planning.
  • Identify noise paths (garage, stairwells, exterior walls).
  • Mechanical/utility areas that transmit hum and vibration.
  • Targeted assemblies based on your layout,  priorities, and lifestyle.

Major additions & renovations

When walls and ceilings are open, you get a rare chance to fix noise the right way, without guesswork. We help you choose the smart “do-it-once” upgrades that match your renovation scope and budget.

Best-fit scenarios:

  • Second-storey additions + new house layouts.
  • Basement finishing ( impact + airborne noise planning).
  • Party-wall upgrades during major remodels.

Townhomes & multiplexes

Shared-wall living magnifies small mistakes. The goal isn’t “less noise,” it’s privacy and peace across party walls, ceilings, and stair areas. We help you plan assemblies that reduce a voice transfer and impact sound before finishes go in.

Common priorities:

  • Party wall between units (speech privacy focus).
  • Floor-ceiling separations (impact + airborne noise strategy).
  • Flanking paths around ducts, bulkhead, and stairwells.
  • Practical build-phase sequencing with your trades.

Commercial spaces

Some businesses can’t tolerate sound bleed—client conversations, treatment rooms, studios, or restaurants where ambiance matters. We reduce voice transfer, manage mechanical noise, and shape calmer interiors with scope options that match your timeline and disruption tolerance.

Typical needs:

  • Confidential conversations and room-to-room speech privacy.
  • Mechanical noise control planning (HVAC, plumbing, equipment).
  • Clean assemblies that support the design intent.
  • Spaces that feel private, calm, and intentional.

Noise control begins with the frame

If quiet matters, it can’t be an afterthought. The biggest gains happen when assemblies and details are decided early, before finishes lock everything in.


  • Better separation at shared walls (party walls).
  • Smarter floor-ceiling assemblies where impact transfer is a risk.
  • Clean sealing at penetrations and mechanical routes.

Jump to Blueprint → Pre-Framing → Pre-Drywall.

Double Studded Wall New Construction

Inaudible is for builders, designers, and architects who want fewer complaints and a higher-end finished feel for their clients.

Quiet by design: Our 3-Phase Method

We’ll help you set realistic targets, choose practical assemblies, and reduce the paths noise uses to travel.

Blueprint Phase

  • Define priorities (speech privacy vs. impact noise vs. mechanical hum).
  • Flag the highest-risk areas and likely flanking paths.
  • Recommend assembly options that match build constraints.
Z

Pre-Framing Phase

  • Confirm where separation and decoupling details matter most.
  • Coordinate key details with your GC and trades.
  • Prevent “hard connections” that create avoidable transfer.

Pre-Drywall Phase

  • Install acoustic treatments where specified.
  • Seal penetrations and weak points before they disappear.
  • Prep for optional follow-up recommendation after finishes.