Luxury Penthouse Ceiling Isolation — Toronto

A Toronto luxury penthouse retrofit addressing wind, roof cracking, chiller hum, rain and city noise through a custom ceiling isolation assembly built around a 20+ ft loft.

Project Snapshot

LOCATION

Toronto, ON

PROJECT TYPE

Luxury Penthouse Retrofit

SERVICES PERFORMED

Tame the Thunder — Custom Tier 3 Ceiling Isolation

PROJECT TIMING

Completed April 2026 • 3-Week Installation

The Challenge

Multiple Noise Sources Above a Newly Renovated Penthouse

The homeowner had recently completed a substantial renovation of this downtown Toronto penthouse, including new flooring, kitchen cabinetry, millwork, finishes and furnishings. Shortly after moving into the space, several noise issues coming from the exposed steel roof decking area became difficult to ignore.

The concerns included wind noises around the roof and window junction, cracking associated with the metal roof during seasonal temperature changes, humming from rooftop mechanical equipment, rain striking the roof assembly and general urban noise entering the residence. Because the interior renovation was already complete, the acoustic work also had to be carried out while carefully protecting the newly finished space below.

Existing conditions

An Exposed Roof Structure With Significant Installation Constraints

The penthouse featured a common style in industrial, loft, and modern architectural design, exposed roof deck with mechanicals and framing elements fully visible, leaving beams, pipes, and HVAC ductwork crossing an uneven ceiling plane of corrugated metal decking. The loft ceiling exceeded 20 feet in height, meaning much of the installation had to be performed from scaffolding.

Several conditions shaped the installation strategy:

  • an exposed and irregular roof structure specifically called exposed corrugated metal deck ceiling;
  • beams, piping and ductwork requiring custom detailing;
  • rooftop mechanical noise;
  • a large vaulted ceiling area;
  • newly completed high-end interior finishes below the work area; and
  • limited tolerance for damage or disruption to the renovated kitchen and living space.

Custom bulkheads were required to accommodate the existing structural and mechanical elements while establishing the finished ceiling geometry.

Before Construction

A Look at the Conditions Before the Ceiling Was Built

Before installation began, Inaudible documented the existing penthouse and the construction challenges involved. The finished kitchen, island and surrounding surfaces required extensive protection before scaffolding and ceiling construction could begin. The new assembly would be suspended from the structure above using isolation components intended to reduce the direct transfer of vibration into the finished ceiling.

Our Approach

Building an Isolated Ceiling Beneath the Existing Roof

Rather than applying a surface treatment to the existing ceiling, Inaudible adapted its Tame the Thunder – Tier 3 ceiling isolation system to the specific conditions of this penthouse.

The system combined several acoustic principles: cavity absorption, structural isolation, added mass, damping, perimeter sealing and treatment around penetrations.

Major components included mineral wool acoustic insulation, isolation hangers and a suspended ceiling grid, multiple layers of 5/8″ gypsum, acoustic damping compound and acoustic sealing.

The completed acoustic construction was then concealed behind a custom pine shiplap ceiling so the retrofit could become part of the architecture of the penthouse rather than remain visually apparent.

tooltip text
L

Acoustic Insulation

Mineral wool acoustic insulation

L

Isolation Hangers

Suspended ceiling grid

L

Drywall Layers

Two 5/8 gypsum with acousic damping between

L

Custom bulkheads

Construction around beams, pipes and HVAC

L

Exposed Ceiling

Corrugated metal decking and fully visible beams and mechanicals

L

Acoustic Sealing

Around perimeters & treatment of applicable penetrations

Scope of Work

What Inaudible Installed

Completed penthouse ceiling soundproofing with cityscape view and acoustic treatments.

The project included

The project included installation of a customized Tame the Thunder ceiling isolation assembly, adapted for the existing roof structure, ceiling height and architectural conditions.

  • protection of the newly renovated kitchen and surrounding finishes;
  • scaffolding and elevated access for the 20+ foot ceiling;
  • custom bulkhead construction around beams, pipes and HVAC services;
  • mineral wool acoustic insulation;
  • a suspended ceiling isolation system using acoustic isolation hangers;
  • multiple layers of 5/8″ gypsum;
  • acoustic damping between appropriate assembly layers;
  • perimeter acoustic sealing;
  • treatment of applicable penetrations;
  • finishing of the completed ceiling assembly; and
  • custom pine shiplap as the final visible ceiling finish.

The exact configuration was selected for the existing roof structure, noise sources and architectural conditions of this particular penthouse.

Installation Process

Three Weeks of Construction Above a Finished Interior

The installation was completed over approximately three weeks by a four-person crew.

Step 1

Protect the Finished Space

Ram Board, plywood and additional temporary protection were installed over the kitchen, island and surrounding finished surfaces before construction began.

Step 2

Establish Safe Access

Scaffolding was erected to provide access to the ceiling, which reached more than 20 feet above the finished floor.

Step 3

Build Around Existing Conditions

Custom bulkheads and supporting construction were created around the exposed beams, piping and ductwork so the new ceiling could integrate with the existing architecture.

Step 4

Install the Isolation System

The acoustic ceiling assembly was constructed using insulation, isolation hardware, suspended framing, added mass, damping and acoustic sealing.

Particular attention was given to perimeter conditions and penetrations that could otherwise create paths for sound or vibration.

Step 5

Complete the Architectural Finish

Once the acoustic construction was closed and finished, pine shiplap was installed across the ceiling to create the final architectural surface.

Step 1

Protect the Finished Space

Ram Board, plywood and additional temporary protection were installed over the kitchen, island and surrounding finished surfaces before construction began.

Step 2

Establish Safe Access

Scaffolding was erected to provide access to the ceiling, which reached more than 20 feet above the finished floor.

Step 3

Build Around Existing Conditions

Custom bulkheads and supporting construction were created around the exposed beams, piping and ductwork so the new ceiling could integrate with the existing architecture.

Step 4

Install the Isolation System

The acoustic ceiling assembly was constructed using insulation, isolation hardware, suspended framing, added mass, damping and acoustic sealing.

Step 5

Complete the Architectural Finish

Once the acoustic construction was closed and finished, pine shiplap was installed across the ceiling to create the final architectural surface.

Before & During

The Work That Disappears Behind the Finished Ceiling
Much of the acoustic construction is no longer visible once the project is complete.

Finished Result

Acoustic Isolation Integrated Into the Architecture

Once construction was complete, the technical components of the isolation system were concealed behind the finished ceiling. The acoustic insulation, isolation hardware, suspended assembly, additional mass, damping and sealing measures are no longer visible from the living space. What remains is a custom pine ceiling designed to complement the renovated penthouse while incorporating the acoustic work above it.

Completed Penthouse Ceiling Isolation

Completed Project Walkthrough

See the Finished Ceiling

At completion, Pascal documented the finished installation and custom pine ceiling after approximately three weeks of construction.

The walkthrough shows the completed architectural finish and provides context for the height, scale and complexity of the installation.

Project Outcome

A Completed Isolation Assembly Built Around the Existing Penthouse

The project transformed an exposed corrugated metal deck ceiling into a finished ceiling incorporating a dedicated acoustic isolation system. The work addressed several noise concerns while accommodating the existing structure, rooftop mechanical conditions, extreme ceiling height and recently completed interior renovation.

The homeowner was pleased with both the completed installation and the finished appearance of the new ceiling.

As with all soundproofing work, performance depends on the complete building assembly, adjacent transmission paths and site conditions. This project documents the approach used for this specific penthouse and should not be interpreted as a guarantee that the same system will produce identical results in another building.

CLIENT PERSPECTIVE

Hear the Project Story From the Homeowner

The technical details explain how the ceiling isolation system was built. The homeowner’s experience explains why the project mattered.

In this project case study, Pascal sits down with the homeowner to revisit the original noise problems, the decision to move forward with professional soundproofing, the challenges of completing the work inside a newly renovated penthouse, and the homeowner’s experience with the finished space.

The conversation provides a first-hand perspective on the project—from the roof and mechanical noise that prompted the work to the construction process and completed ceiling.

Watch: Luxury Penthouse Ceiling Isolation — Client Case Study

Related Services

Explore the Services Behind This Project

Residential Soundproofing

Soundproofing solutions for existing homes, condos and residential spaces.

Ceiling & Floor Soundproofing

Isolation strategies for sound travelling through floor and ceiling assemblies.

Condo Soundproofing

Soundproofing approaches for high-rise residences and shared building assemblies.

MORE COMPLETED WORK

Explore More Projects

See how Inaudible has approached different noise problems, building conditions and construction requirements across residential, commercial and new-build projects.

Planning a Similar Project?

Every building and noise path is different. Tell us about your project and we’ll help identify the appropriate next step.